Demo record only. All project names, people, and defects are fictional. This illustrates the structure of a real SnapStrux digital snag list.

What you're looking at

A sample digital snag list for a fictional South African residential development at practical completion. In a real project, each defect was captured on site with a photo, assigned to a contractor, and tracked through to sign-off.

About digital snag lists →  |  JBCC practical completion records →  |  See a sample site report →

Snag List · Practical Completion
Westridge Heights Development — Block B
Practical Completion Snag Register
Inspection Date 22 May 2026
Contractor Apex Construction (Pty) Ltd
Principal Agent Van der Merwe & Associates
Contract JBCC PBA Ed.6.2
10
Total snags
6
Open
4
Actioned
3
Units
Unit 3A — Level 3, North Block
3 Open · 1 Actioned
QR code linked · Owner access active
1
Cracked render on external bathroom wall — north elevation, 340mm crack
Plastering subcontractor 📷 Photo + measurement markup Captured: 22 May 2026
Open
2
Missing silicone bead — kitchen counter to wall junction, full length 2.4m
Tiling subcontractor 📷 Photo Captured: 22 May 2026
Open
3
Bathroom extractor fan not operational — no response on switch
Electrical subcontractor 📷 Photo Captured: 22 May 2026
Open
4
Paint touch-up completed — bedroom ceiling, three patches. Surface flush and colour matched.
Painting subcontractor 📷 Before + After photos Actioned: 27 May 2026
Actioned
Unit 4B — Level 4, North Block
2 Open · 2 Actioned
QR code linked · Owner access active
5
Window frame out of plumb — lounge north window, left jamb 8mm out of vertical
Aluminium window subcontractor 📷 Photo + measurement markup (8mm/2.1m) Captured: 22 May 2026
Open
6
Cupboard door hinge misaligned — master bedroom built-in cupboard, door 3 of 4
Carpentry subcontractor 📷 Photo Captured: 22 May 2026
Open
7
Shower drain blocked — cleared and flow tested. Running free.
Plumbing subcontractor 📷 Photo Actioned: 26 May 2026
Actioned
8
Balcony door handle replaced — previous handle stripped thread. New hardware fitted and tested.
Carpentry subcontractor 📷 Photo Actioned: 27 May 2026
Actioned
Common Areas — Block B
1 Open · 1 Actioned
9
Exposed steel edge on entrance slab — trip and injury risk. Hoarding required until grinding and nosing applied.
Concrete subcontractor 📷 Photo · Safety flag Captured: 22 May 2026
Open
10
Fire door self-closer replaced and tested — Level 3 stairwell. Compliant with SANS 10400-T.
Joinery subcontractor 📷 Photo Actioned: 25 May 2026
Actioned

See sample site report →  |  About digital snag lists →  |  Evidence packs →

Manage your own snag lists digitally — free trial, no paper required.

Start Free Trial →